5. Connection and Operation
EN
WARNING: The system may be installed and wired only by qualified electricians in accordance with applicable safety regulations!
5.1. Connection and operation for 1K(S)/2K(S)/3K(S)
When installing the electrical wiring, please note the nominal amperage of your incoming feeder
1: Inspection
Inspect the packaging carton and its contents for damage. Please inform the transport agency immediately should you
find signs of damage. Please keep the packaging in a safe place for future use.
Nota: Please ensure that the incoming feeder is isolated and secured to prevent it from being switched back on again.
2: Connection
2.1. UPS Input Connection:
If the UPS is connected via the power cord, please use a proper socket with protection against electric current, and pay
attention to the capacity of the socket: over 10A for 1K(S) & 2K, over 16A for 2KS& 3K(S).
2.2. UPS Output Connection:
The output of 1K(S) and 2KS(Non CE) are socket-types only. Simply plug the load power cord to the output sockets to
complete connection..
Besides output sockets,2KS(CE) and 3K/3KS has the terminal block available for output as well. The wiring configuration
is shown as the following procedure:
Step 1: Remove the small cover of the terminal block
Step 2: Use AWG14 or 2.1mm² wires for wiring configuration
Step 3: Upon completion of the wiring configuration, please check whether the wires are securely affixed.
Step 4: Put the small cover back to the rear panel.
3: Computer Connection
Connect your computer to the outlet sockets of the UPS system following the above diagram.
CAUTION: Do not connect equipment which would overload the UPS system (e.g. laser printers)
4: Battery Charge
Fully charge the batteries of the UPS system by leaving the UPS system connected to the mains for 1-2 hours. You may
use the UPS system directly without charging it but the stored energy time may be shorter than the nominal value
specified.
5: Turn On the UPS
5.1. With utility power connecting:
Press "I" button continuously for more than 1 second to turn on the UPS. Then the UPS will get into self-test status first.
After having finishing the self-test, the UPS will get into the inverter mode, at this time, the Utility Power LED, Inverter
LED, and Load and Battery Capacity LEDs will light up.
5.2. Without utility power connecting
Even though utility power is connected to the UPS, the UPS still can be turned on by just simply pressing "I" button
continuously for more than 1 second. Then the UPS will get into self-test status first. After having finishing the self-test,
the UPS will get into the inverter mode, at this time, Battery LED, Inverter LED, and Load and Battery Capacity LEDs will
light up.
Note: The default setting for bypass mode is no output after UPS is connecting utility power and breaker is turned on.
This can be configured by monitoring software.
66
PH 9701 | PH 9720 | PH 9735 | PH 9765 | PH 9715
Uninterruptable Power Supply
UPS Power section
Output
Segurança e harmonia
ININTERRUPTA