Use And Maintenance; Commissioning The Boiler; Lighting And Operation; Lighting The Boiler - Sime 1R OF Serie Manual De Uso

Ocultar thumbs Ver también para 1R OF Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3

USE AND MAINTENANCE

3. 1
COMMISSIONING
THE BOILER
When commissioning the boiler it is
recommended:
– to make sure that the system has
been filled with water and adequa-
tely vented;
– to make sure that the flow and
return valves are fully open;
– to make sure that flue and chimney
are free from obstructions;
– to make sure that the electrical con-
nections t o t he mains and t he
earthing are correct;
– to make sure that no flammable
liquids or materials are near the boi-
ler.
3.2

LIGHTING AND OPERATION

3.2. 1 Lighting the boiler

To light the boiler proceed as follows
2
48
(fig. 11):
– switch on the main switch (1) and
verify that the green LED (3) turns
on to confirm the presence of volta-
ge. The burner will start;
– turn the boiler stat knob (5) to the
desidered setting.
For best results, set the boiler stat
knob to a temperature no lower
than 60°C to prevent the formation
of condensate.
The set temperature value can be
checked on the thermometer (4).
3.2.2 Safety stat
The safety stat with automatic reset
calibration set at 100°C (2 fig. 11)
trips, immediately turning off the bur-
ner when t he boiler accident all y
overheats.
To restore normal operations, wait
until the temperature drops below the
thermostat calibration setting.
4
3
1
RVA 43.222 controller slot
3.2.3 System filling
Periodically check the pressure values
of the hydrometer mounted onto the
system, when the system is cold,
should range between 1 and 1.2 bar.
If the pressure is less than 1 bar, reset
the system.
3.2.4 Turning OFF boiler
To temporarily turn off the boiler turn
off the electricity supply by pressing
the main switch (1 fig. 11).
The following operations must be car-
ried out if the plant will not be in use for
a lengthy period of time:
– position the main switch of the plant
on off;
– turn the fuel and water taps of the
central heating plant off;
– empty the central heating plant if
there is danger of frost:
5
Fig. 11

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido