Use And Maintenance; Commissioning The Boiler; Lighting And Operation - Sime B4 INOX BF TS Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 17
3

USE AND MAINTENANCE

3. 1
COMMISSIONING
THE BOILER
When commissioning the boiler always
make sure that:
– the system has been filled with
water and adequately vented;
– the flow and return valves are fully
open;
– the flue and chimney are free from
obstructions;
– the electrical connections to the
mains and the earthing are correct;
– no flammable liquids or materials
are near the boiler;
– check that the circulating pump is
not locked.
3.2
LIGHTING AND
OPERATION
3.2. 1 Lighting the boiler (fig. 6)
To light the boiler proceed as follows:
– switch on the main switch (1); the
9
4
48
green light turns on to indicate that
the appliance is powered (3). The
burner will start;
– set the stat knob (7) to the desired
D.H.W. temperature.
The boiler pump will continue operat-
ing until the preset temperature has
been reached.
While the water is being heated, the
boiler will continue automatic opera-
tion to maintain the heating temper-
ature shown on the thermometer
(5) around 80°C by means of the
limit stat (6);
– once the water has been heated
with the selector (2) set to the sum-
mer function position, the burner
and the circulating pump will cease
operation; when the selector (2) is
set to the winter position, the sys-
tem pump controlled by the room
stat will start up.
In this case, operation of the burner
will be controlled by the boiler stat
(8) at the preset temperature;
– for best results, set the boiler stat
6
3
1
5
knob (8) to a temperature no lower
than 60°C to prevent the formation
of condensate.
The set temperature value can be
checked on the thermometer (5).
3.2.2 Safety stat (fig. 6)
The manually reset safety stat (4) trips
to switch-off the burners immediately
when the boiler temperature exceeds
95°C.
To restart the boiler, unscrew the black
cover and press the button under-
neath.
If the problem occurs frequently, call
an authorised technical assistance
centre for the necessary checks to
be carried out.
3.2.3 System filling (fig. 6)
If the orange LED (9) switches on due
7
2
8
Fig. 6

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

B5 inox bf ts

Tabla de contenido