Use And Maintenance - Sime MURELLE HE 110 R Manual De Usuario

Ocultar thumbs Ver también para MURELLE HE 110 R:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4

USE AND MAINTENANCE

4. 1
GAS VALVE (fig. 16)
The boiler is supplied as standard with a
gas valve, model SIT 822 NOVAMIX (fig.
16).
EV2
5
6
EV1
KEY
1
Upstream pressure intake
2
Downstream pressure intake
5
Shutter
6
OFF-SET
4.2
GAS CONVERSION (fig. 17)
This operation must be performed by
authorised personnel using original Sime
components.
To convert from natural gas to LPG or vice
versa, perform the following operations
–Close the gas cock.
–Replace the nozzle with OR (1) and gasket
(2) with the one supplied in the kit.
–Inspect all the gas connections using
soapy water or relevant products. Do not
use naked flames.
–Apply the nameplate with the new gas
flow layout.
–Calibrate the maximum and minimum
pressures of the gas valve following the
instructions provided in paragraph 4.2.2.
4.2. 1
New fuel configuration
For access to the installer's parameters,
press simultaneously keys
5 seconds (3 fig. 12).
The parameters will scroll up and down
with the keys
and
.
The display pane will show the values of the
parameter PAR 1. If the boiler is a methane
(G20) model, SET 7 will be displayed:
To change the fuel to propane (G31), it is
90
2
1
2
1
Fig. 16
necessary to set SET 15, by pressing the
key
.
The standard display will automatically
return after 10 seconds.
The table below shows the SET settings to
enter when the type of gas fuel is changed.
GAS
METHANE
(G 20)
PROPANE
(G 31)
and
for
4.2.2
Calibrating the gas valve
pressures
Measure the CO
analyzer.
Sequence of operations:
1) Press and hold the button down for a
MODEL
PAR 1
Single (110 R)
7
Sequence/cascade
8
Single (110 R)
15
Sequence/cascade
16
values with a combustion
2
.
few seconds
2) Press the button for a few seconds
3) Identify the CO
values at max. power by
2
adjusting the shutter (5 fig. 16):
MAX power
CO
(Methane)
CO
(Propane)
2
2
9,0 ±0,3
10,2 ±0,3
4) Press the button for a few seconds
5) Identify the CO
values at min. power by
2
adjusting the OFF-SET regulation screw
(6 fig. 16):
MIN power
CO
(Methane)
CO
(Propane)
2
2
9,0 ±0,3
10,2 ±0,3
6) Press the buttons several times to
check the pressures
and
ge them if required.
7) Press the button
once more to quit
the function.
4.4
DISASSEMBLING
THE SHELL (fig. 19)
To simplify maintenance operations on the
boiler, it is also possible to completely remo-
ve the shell, as shown in figure 19.
Turn the control panel to move it forward
and be able to access the internal compo-
nents of the boiler.
Fig. 17
.
.
chan-

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido