Installation; Boiler Room; Boiler Room Dimensions; Connecting Up System - Sime 1R OF Serie Manual De Uso

Ocultar thumbs Ver también para 1R OF Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1.6.4 SIME gas-oil burners
Boiler
Model
1R 10 OF
MACK 7
1.6.5 RIELLO gas burners
Boiler
Model
1R 6÷9 OF
GS10
1R 10 OF
FS10
2R 6 OF
GS10
2R 7÷8 OF
BS 3
2R 9÷11 OF
BS 4
2R 8÷15 OF
RS 28
2R 8÷15 OF
RS 28/1
1.6.6 Burner flange
The dimensions of the diesel burner
anchorage flange are given in fig. 4.
A
mm
mm
1R 6 OF
110
150
1R 7÷10 OF
130
170
2R 6-7 OF
130
170
2R 8÷15 OF
160
190 M10
2R GT 6-7 OF
130
170
2R GT 8÷15 OF
160
190 M10
2

INSTALLATION

2. 1

BOILER ROOM

The boiler room should feature all the
characteristics required by standards
governing liquid fuel heating systems.
2.2

BOILER ROOM DIMENSIONS

Position the boiler body on the founda-
tion bed, which should be at least 10
cm high. The body should rest on a
surface allowing shifting, possibly by
means of sheet metal.
Leave a clearance between the boiler
and the wall of at least 0.60 m, and
between the top of the casing and the
ceiling of 1 m (0.50 m in the case of
boilers with incorporated D.H.W. tank).
The ceiling height of the boiler room
should be less than 2.5 m.
2.3

CONNECTING UP SYSTEM

When connecting up the water supply
to the boiler, make sure that the speci-
fications given in fig. 1 are observed.
All connecting unions should be easy
to disconnect by means of tightening
Atomising
angle
60°
Output (kW)
1°stage
42÷116
42÷116
42÷116
65÷189
110÷246
81
163÷349
B
C
ø
M8
M8
M8
M8
rings. A closed expansion tank system
must be used.
2.3. 1 Filling the water system
Before connecting the boiler, thorou-
ghly flush the system to eliminate
scale which could damage t he
appliance.
Filling must be done slowly so as to allow
any air bubbles to be bled off through the
air valves. In closed-circuit heating
systems, the cold water filling pressure
and the pre-charging pressure of the
expansion vessel should be no less than
or equal to the height of the water head
of the installation (e.g. for water head of
5 metres, the vessel pre-charging pres-
sure and installation filling pressure
should be at least 0.5 bar).
2.3.2 Water system
characteristics
Water supplying the heating circuit
must be treated in accordance with
UNI-CTI 8065 standards.
It is absolutely essential to treat water
Boiler
Electrical
2°stage
data
±
230V
10%
±
230V
10%
±
230V
10%
±
230V
10%
±
230V
10%
±
163-325
230V
10%
±
230V
10%
B
Model
Atomising
angle
Gas
type
50Hz
G20/25 - G30/31
~
50Hz
G20/25 - G30/31
~
50Hz
G20/25 - G30/31
~
50Hz
G20/25 - G30/31
~
50Hz
G20/25 - G30/31
~
50Hz
G20/25 - G30/31
~
50Hz
G20/25 - G30/31
~
in the heating system in the following
cases:
– for extensive systems (with high
contents of water);
– frequent addition of water into the
system;
– should it be necessary to empty the
system either partially or totally.
2.4

CONNECTING UP FLUE

The flue is of fundamental importance
for the proper operation of the boiler;
if not installed in compliance with the
standards, starting the boiler will be
difficult and there will be a consequent
formation of soot, condensate and
encrustation.
The flue used to expel combustion pro-
ducts into the atmosphere must meet
the following requirements:
– be constructed with waterproof
materials, and resistant to smoke
temperature and condensate;
– be of adequate mechanical resilien-
ce and of low heat conductivity;
– be perfectly sealed to prevent coo-
ling of the flue itself;
– be as vertical as possible; the termi-
Fig. 4
43

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido