SMA SUNNY HIGHPOWER PEAK1 Instrucciones De Instalación página 33

Ocultar thumbs Ver también para SUNNY HIGHPOWER PEAK1:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

SMA Solar Technology AG
ID
Status
message
34–37
40
Utility grid
not OK.
41–43
48, 51
54–56
61
62
64-81
Table 4.1 Grid-related events
Installation Guide
Description
The residual-current monitoring
unit (RCMU) detected an
overcurrent.
The utility grid has been
outside the permissible range
for more than ten minutes
(frequency and/or voltage).
Fault ride through. The inverter
has detected that the grid
voltage was below or above a
certain level.
Grid frequency too low or too
high.
DC current share in utility grid
is too high (stage 2).
Grid failure, open phase
detected.
Grid failure.
Grid voltage on phase too low. Check voltage and AC installation.
Measure
Turn off both DC and AC supply
and wait until the display turns off.
Then turn on DC and AC supply
and observe if the event reoccurs.
Visual inspection of all PV cables
and modules.
Check grid frequency, grid voltage,
software version and grid code
setting.
If this event is reported several times
each day, perform onsite grid
analysis.
Check grid frequency and AC
installation.
For repeated daily occurrences,
perform onsite grid analysis.
If the event reoccurs several times
each day, contact the responsible
grid operator.
If the event reoccurs several times
each day, contact the responsible
grid operator.
If the voltage is zero, check the
fuses.
4  Service
DNO SMA
Service
Line
-
x
x
-
x
-
x
-
x
-
x
-
x
-
SHP75-10-IA-xx-15
PV
-
-
-
-
-
-
-
33

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido