4 Service
ID
Status
message
219–
221
225–
240,
275
241,
242,
245,
249
248
252–
254
243,
263
279
280
281
282
283
323
Table 4.4 Internal events
36
SHP75-10-IA-xx-15
Description
Internal error. Voltage
measured before and after the
relay differs too much.
Failure in memory/EEPROM.
Internal communications fault.
Internal CPU error.
Current measured on AC side
is too high.
Internal error.
Temperature sensor error.
Self-test 24-hour timeout.
Self-test must run at least once
per 24 hours.
Too many RCMU events
during the past 24 hours. Only
four automatic reconnect
attempts after event 34 is
allowed during a 24-hour
period. The inverter will
automatically try to reconnect
after a certain period.
Grid code settings invalid.
Gatedrive error.
Internal fan error. Maximum
output power has been
reduced.
Measure
Contact the service.
Restart the inverter. If the event
persists, call Service.
Restart the inverter. If the event
persists, call Service.
Restart the inverter. If the event
persists, call Service.
If the event repeats, call Service.
Restart the inverter. If the event
persists, call Service.
If the event persists, call Service.
None.
Wait up to 24 hours. If event 34
recurs, follow the action for event
34.
Restart the inverter. If the event
persists, ask Service to generate a
new grid code file or reselect a
standard grid code.
Restart the inverter. If the event
persists, call Service.
If the event repeats, call Service.
SMA Solar Technology AG
DNO SMA
PV
Service
Line
-
x
-
-
x
-
-
x
-
-
x
-
-
x
-
-
x
-
-
x
-
-
-
-
-
x
-
-
x
-
-
x
-
-
x
-
Installation Guide