Display; Initial Setup Via Lcs-Tool - SMA SUNNY HIGHPOWER PEAK1 Instrucciones De Instalación

Ocultar thumbs Ver también para SUNNY HIGHPOWER PEAK1:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

3  Initial Setup and Start

3.2 Display

INFORMATION
It may take some time until the display responds after
switching on.
The integrated display on the inverter front gives the user
access to information about the PV system and the inverter.
Figure 3.1 Overview of display buttons and functionality
Display buttons and functionality
Button
Function
F1
Adjust the contrast level of display.
Use arrow up/down button while
pressing the F1 button.
F2
No function
F3
F4
Home
Return to main screen
OK
No function
Arrow upwards
A step up
Down arrow
A step down
Arrow right
Toggles screen right
Arrow left
Toggles screen left
Back
Return to main screen
On – green LED
Alarm – red LED
Table 3.2: Display buttons and functionality
30
SHP75-10-IA-xx-15
The screen design is divided into different sections:
1. Main screen. Current and daily yield.
This section contains:
– Actual output power (kW)
– Yield of the current day (kWh)
– Total yield (kWh)
– Current date
– Current time
– Operating mode (#)
2. Inverter information. This section contains:
– Inverter device type
– Inverter name
– Inverter serial number
– IP address
– Serial number of the SMA Inverter Manager
– Software version of the inverter
3. Actual values. This section contains:
– PV voltage and current
– Phase-to-phase voltages
– Phase currents
– Grid frequency

3.2.1 Initial Setup via LCS-Tool

The inverter and the SMA inverter manager must be
commissioned via the local commissioning and service tool
(LCS-Tool). Commissioning is necessary before the inverter
is connected to the AC utility utility grid and feed-in
operation begins.
The LCS too enables the selection of predefined country
data sets for different utility grids. Customer-specific country
data sets can be provided by SMA and imported via the
LCS tool (see installation manual of the SMA Inverter
Manager / SMA Digital I/O Box / LCS Tool).
After installation, check all cables and close the inverter.
Turn on AC power.
Selecting the correct grid code is important in order to
comply with the local and national standards.
It is possible to create customer-specific grid code files
with adjusted set values (see Section 3.2.4).
SMA Solar Technology AG
Installation Guide

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido