Malfunction, Spindle Nut Failure; Maintenance; Service - REXROTH 3 842 546 991 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 212

9.4 Malfunction, spindle nut failure

In the event of a defective spindle nut, a special safety nut takes over the holding
function of the load lifting device. Lifting/lowering is no longer possible. Take the
case lifter out of operation and notify the service team.

10 Maintenance

Moving parts!
Danger of crushing body parts between the machine, periphery, or fl oor.
Switch off the unit fi rst before performing any maintenance work.
Make sure the unit is secured against being switched on again during this period
(pull out the mains plug and secure against reinsertion).
Maintenance work may only be carried out by specialists.

10.1 Service

Allow only specialists to carry out the service.
Maintenance interval: As required
1
) The case lifter is maintenance-free in a clean industrial environment.
100,000 stroke cycles correspond to 5 years of 3 shift operation at full load or
10 years of 2 shift operation at medium load.
WARNING
1
).
3 842 358 709/2016-07, MPS, Bosch Rexroth AG
Maintenance
43/52

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

3 842 546 992

Tabla de contenido