Installing The Lcd Monitor - Waeco PerfectView M9LQ Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 58
PerfectView M9LQ
6.3
Main menu
In the main menu, the following sub-menus are displayed:
Sub-menu
Camera setup
Camera name
OSD setup
System setup
Trigger setup
Trigger priority
Reset all
7

Installing the LCD monitor

7.1
Tools required (fig. 1, page 3)
For installation and assembly you will need the following tools:
 Measuring ruler (4)
 Centre punch (5)
 Hammer (6)
 Drill head set (7)
 Drill (8)
 Screwdriver (9)
To establish and test the electrical connection, the following tools are required:
 Diode test lamp (1) or voltmeter (2)
 Heat shrinking sleeve
 Hot air blower (10)
 Crimping tool (11)
 Soldering iron (optional) (12)
 Solder (optional) (13)
 Insulating tape (14)
 Cable bushing sleeves (optional)
To fasten the cables, you may require additional cable binders.
EN
Description
The menu for making camera settings.
The list of cameras and their display names in normal
mode.
The menu for making screen display settings.
The menu for making monitor settings.
The menu for making trigger function settings.
The priority list for the trigger function.
Restores the device to the default settings.
Installing the LCD monitor
31

Publicidad

Tabla de contenido
loading

Tabla de contenido