Installing The Lcd Monitor - Waeco PerfectView M59L Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 82
_M59L_EB_10s.book Seite 46 Dienstag, 22. Januar 2008 4:59 16

Installing the LCD monitor

Proceed as follows to solder two cables together:
➤ Strip the two cables (fig. d A, page 7).
➤ Place a shrink sleeve with a length of approx. 20 mm over the cable
(fig. d B, page 7).
➤ Twist the cables together and solder them (fig. d C, page 7).
➤ Place a shrink sleeve over the soldered point and heat it briefly (fig. d D,
page 7)
8
Installing the LCD monitor
Tools required (fig. 1, page 3)
8.1
For installation and assembly you will need the following tools:
Drill bit set (1)
Drill (2)
Screwdriver (3)
Set of ring or open-ended spanners (4)
Measuring ruler (5)
Hammer (6)
Centre punch (7)
To make and test the electrical connection, the following tools are required:
Diode test lamp (8) or voltmeter (9)
Crimping tool (10)
Insulating tape (11)
Hot air blower (13)
Soldering iron (14)
Solder (15)
Cable bushing sleeves (if necessary)
To fasten the cables you may require additional cable binders.
46
PerfectView

Publicidad

Tabla de contenido
loading

Tabla de contenido