Descargar Imprimir esta página

dirna Bergstrom bycool CAMPER Instrucciones De Montaje página 17

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 1
CAMPER
Place assembly joint around cut and in lower part
3
of evaporation system, as indicated on picture.
Seal inside with silicone.
3
Assemble evaporation system from outside and
4
from inside, centre it on cut made in roof.
Assemble frame, fastening it with (4) sheet
5
thread screws. Assemble (2) fastening supports
on previously mentioned frame and holes of
evaporation system using (4) M6/100x60 bolts,
with nuts and flat washers.
Fasten canalisation system to both supports
6
using (4) M4/70x10 screws and put cables
through.
Connect cables to front and fasten front with
windows on canalisation system previously
assembled, using (4) M4/70x15 screws.
Silicone
3
5
6
17
EN
®
4
5

Publicidad

loading