dirna Bergstrom bycool COMPACT 3.0 Instrucciones De Montaje página 27

Ocultar thumbs Ver también para bycool COMPACT 3.0:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

COMPACT 3.0
13
Fasten supports tightening nuts until outside
EPDM joint of equipment is compressed,
between 3 and 6 mm;
Important: To avoid water from filtering inside
cabin, check EPDM joint tightening with unit
base, as indicated on diagram.
3-6mm.
Cabin roof
Fasten selflocked nut until
13
EPDM gasket is compressed
between 3 and 6 mm.
14
Tighten (4) M8 nuts to support and (4) to Unit
base.
15
Place console using (4) M6/100x15 allen head
screws bolts.
EPDM gasket
10 mm*
(*) (approx. after tightenin
15
Air conditioning for vehicles
Base
Bracket
27
Check compression
thickness using a
tape measure in the
four corners.
EPDM gasket
15
EN
13
14

Publicidad

Tabla de contenido
loading

Tabla de contenido