6 Bench Alignment
6.1
Static Alignment
Keep the build line between pivots as shown, using shift and/or tilt devices as necessary.
Trans-
femoral
½
Trans-
tibial
In-Line
Filter
Check
Valve
*
Approx. 1/3
Build
Line
½
2/3
Align transfemoral devices according to the
instructions for use that are supplied with
the knee.
Tilt Setting
Align limb to achieve range of motion shown.
For the Vacuum System Assembly
see Section 8.
Wrap the vacuum tubing around the pylon as
shown and position the Check Valve close to
the ankle for the best vacuum performance.
Ref: 10 mm
Foot shell only
*
Allow for user's own
footwear
10
3°
6°
938432/3-1219