SMA RAPID SHUTDOWN SYSTEM Instrucciones De Instalación página 38

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

10 Decommissioning the Rapid Shutdown System
8. Hang the enclosure lid in the bracket of the
upper enclosure edge and tighten the four
screws using a hex socket screwdriver (TX 25)
(torque: 6 Nm ± 0.6 Nm (53 in-lb ± 5 in-lb)).
9. Remove the equipment grounding conductor of the Rapid Shutdown Box. To do so, loosen the
hexagon nut using a wrench and remove the hexagon nut, the spring lock washer and the
clamping bracket from the grounding bolt.
10. Remove the Rapid Shutdown Box. To do this, depending on the mounting type, unscrew the
screws for attachment using a suitable screwdriver and remove the Rapid Shutdown Box from
the rack rail, from the wall or from the roof.
11. Unscrew the 4 screws in the upper enclosure
part of the Rapid Shutdown Controller using a
cross-head screwdriver (PZ 2), remove the upper
enclosure part and place to one side.
12. Remove the conductors from the terminal blocks. To do so, loosen the screw of each terminal
using a cross-head screwdriver (PZ 2) and pull the conductors out of the terminal.
13. Remove the conduits and conduit fittings or the adapter from the Rapid Shutdown Controller.
14. Remove the Rapid Shutdown Controller. To do this, unscrew the four screws for attachment
using a cross-head screwdriver (PZ 2) and remove the Rapid Shutdown Controller from the
wall.
38
RSS-US-IA-xx-13
SMA Solar Technology America LLC
Installation Manual

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Rss-us-ia-14 serie

Tabla de contenido