Maintenance - Mitsubishi Electric Mr.SLIM SLZ-A18AR Para El Instalador

Ocultar thumbs Ver también para Mr.SLIM SLZ-A18AR:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 50

11.Maintenance

B
A
G
K
H
I
A Indoor unit
B Union
C Liquid pipe
D Gas pipe
E Stop valve
F Outdoor unit
G Refrigerant gas cylinder operating valve
Fig. 11-1
E
C
F
D
M
L
J
H Refrigerant gas cylinder for R410A with
siphon
I Refrigerant (liquid)
J Electronic scale for refrigerant charging
K Charge hose (for R410A)
L Gauge manifold valve (for R410A)
M Service port
11.1. Gas charge (Fig. 11-1)
1. Connect gas cylinder to the service port of stop valve (3-way).
2. Execute air purge of the pipe (or hose) coming from refrigerant gas cylinder.
3. Replenish specified amount of refrigerant, while running the air conditioner
for cooling.
Note:
In case of adding refrigerant, comply with the quantity specified for the refrigerating
cycle.
Caution:
• Do not discharge the refrigerant into the atmosphere.
Take care not to discharge refrigerant into the atmosphere during installa-
tion, reinstallation, or repairs to the refrigerant circuit.
• For additional charging, charge the refrigerant from liquid phase of the gas
cylinder.
If the refrigerant is charged from the gas phase, composition change may
occur in the refrigerant inside the cylinder and the outdoor unit. In this case,
ability of the refrigerating cycle decreases or normal operation can be impos-
sible. However, charging the liquid refrigerant all at once may cause the com-
pressor to be locked. Thus, charge the refrigerant slowly.
To maintain the high pressure of the gas cylinder, warm the gas cylinder with warm
water (under 40°C) during cold season. But never use naked fire or steam.
13

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Mr.slim slz-a09arMr.slim slz-a12ar

Tabla de contenido