5. Engage the end of the Mounting Strap with the Mounting Strap Adjusting Screw.
6. Slide strap under the spring clip of one of the Mounting Frames.
7. Tighten the Mounting Strap Screw enough to take up all of the slack, but not enough to
8. Rotate the assembly on the pipe to the final conditioned location, ensuring that it is
9. Tighten the mounting straps to seat the assembly firmly on the pipe. Do not over tighten.
FUP1010 IP67 Portable Quick Start
Operating Instructions, 01/2013, CQO:QSG003 Revision 05
prevent rotation of the assembly.
straight along the pipe axis. (Refer to the sensor orientation diagram.)
Repeat procedure for the other Mounting Frame
Commissioning
3.4 Sensor Installation
.
27