Lenze L-force 9400 Serie Instrucciones Para El Montaje página 64

Ocultar thumbs Ver también para L-force 9400 Serie:
Tabla de contenido

Publicidad

6
Wiring the device
Wiring
Terminal assignment
Mains
Terminal X111
^ Fig. 6−3
Terminal X112
^ Fig. 6−3
Terminal data
Device size 4:
Connection with ring
cable lug M8
Device size 5:
Connection with ring
cable lug M10
DC bus
Terminal X111
^ Fig. 6−3
Terminal X112
^ Fig. 6−3
Terminal data
Device size 4:
Connection with ring
cable lug M8
Device size 5:
Connection with ring
cable lug M10
64
Labelling
Description
L1
Connection of the mains phases L1, L2, L3
L2
L3
+
Connection for the supply−side PE conductor
C
ti
f
Labelling
Description
L1
Alternative connection at the bottom: mains phases L1, L2, L3
L2
L3
+
C
ti
f
Connection for the supply−side PE conductor
Max. conductor cross−section
2
[mm
]
[AWG]
50
1/0
(2 x 25)
120
4/0
(2 x 50)
(2 x 1/0)
Labelling
Description
+UG
Connection of DC−bus voltage
−UG
Cables routed upwards
Labelling
Description
+UG
Connection of DC−bus voltage
−UG
Cables routed downwards
Max. conductor cross−section
2
[mm
]
[AWG]
2/0
70
(2 x 35)
150
300 mcm
(2 x 70)
(2 x 2/0)
l
th
l
id PE
d t
th
l
id PE
d t
Tightening torque
[Nm]
[lb−in]
8
71
15
133
Tightening torque
[Nm]
[lb−in]
8
71
15
133
EDK94PNE245 DE/EN/FR/ES/IT 4.0
!
SW13
SW15
!
SW13
SW15

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

L-force e94apne 4 serieL-force e94apne1004L-force e94apne2454

Tabla de contenido