EN
ASSEMBLY INSTRUCTIONS
Assembly preparation
On-site preparations
For the installation of the hood, the customer must ensure that the hood can be installed
smoothly, cover kitchen appliances - remove obstacles.
Prepare suitable exhaust air ducting in the ceiling, open false ceiling, create openings, etc.
Before drilling in the wall, ensure that no pipes behind it can be damaged.
If not yet available, lay the power supply line.
For exhaust air operation (A+B), install a window contact switch !
35