Receiving And Inspecting The Equipment; Storage; Unpacking; Overview Of The Equipment - Parker 20H-MD Guia Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

2.3 Receiving and Inspecting the Equipment

On receipt of the equipment carefully inspect the packaging for damage. If the packaging is damaged inform the delivery company immediately
and contact your local Parker Hannifin office.

2.3.1 Storage

If the equipment is to be stored prior to installation, do not remove it from the packaging. Ensure that it is stored in an upright position as
indicated by the arrows on the packaging.
Do not attempt to lift the generator by yourself. It is recommended that the generator be carried by a minimum of two persons or transported
on a pallet truck.
Note. The storage area should be secure and the environmental conditions should fall within those specified in the technical specification.If the
generator is stored in an area where the environmental conditions fall outside of those specified, it is essential that it be moved to its final
location (installation site) and left to stabilise prior to unpacking. Failure to do this could cause condensing humidity and potential failure of the
generator.
If the generator has been stored for a period of 90 days or more, it will automatically perform a 240 minute (4 hours) initialisation sequence on
power up. This sequence, which cannot be aborted, is necessary to guarantee the correct hydration of the cell and operation of the micro-dryer.

2.3.2 Unpacking

Once ready to install, remove the equipment from the packaging and check for signs of damage. Verify that the items specified on the hydrogen
product packaging list have been included with the shipment.
If any items are missing or damaged please contact your local Parker Hannifin office. Do not attempt to power up the generator.

2.3.3 Overview of the equipment

Key:
1
Control panel
2
Options board connection port
O
Vent (< 250 ml / min)
3
2
Excess H
vent (< 1 ml / min)
4
2
5
Water bottle vent
6
Water drain
7
Auto water fill (factory or field fit option)
8
Overflow drain
9
Fuse 1
10
Switched IEC 320 inlet socket.
11
Fuse 2 (110H-MD only)
12
Hydrogen purge outlet
13
Water bottle spillage drain
14
Hydrogen Outlet
5

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

40h-md60h-md110h-md

Tabla de contenido