Operating Diagram - Sime MURELLE EQUIPE 100 BOX Manual De Instrucciones

Ocultar thumbs Ver también para MURELLE EQUIPE 100 BOX:
Tabla de contenido

Publicidad

1.4

OPERATING DIAGRAM

3
1
M
2
21
29
R
26
11
8
9
10
6
24
27
19 20
S3
23
25
7
G
22
KEY
1 Cascade supply probe (SMC)
2 Hydraulic compensator
3 ----------
5 Condensation drain siphon
6 Gas valve
7 ----------
8 Fan
9 Heating supply probe (SM)
10 Safety thermostat 95°C
11 Sensor fumes (SF)
12 Primary exchanger
14 Heating return probe (SR)
15 Pressure transducer
17 Check valve
18 Pump with air release vent
19 ----------
20 ----------
21 ----------
22 3-way drain tap
23 System supply tap
24 Single module drain
25 Gas tap
26 8 litre expansion tank
27 Safety valve 3.5 bar
29 ----------
30 Antifreeze siphon sensor (SB/SA)
FIXTURES
M System supply
R
System return
G
Gas
S3 Condensation drain
12
14
5
30
15
18
17
ES
ENG
FR
Fig. 2
37

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Murelle equipe 150 boxMurelle equipe 100 box mMurelle equipe 150 box m100 box erp150 box erp

Tabla de contenido