3. If present, plug in the TCP-IP (1) data connection.
4. If present, plug in the energy meter into Modbus RTU (7).
5. If present, plug in the RS485 (2) data connection. Plug in any termination plugs that may be
required.
6. Press the DC cable plugs into the DC connectors (4, 5) on the inverter (these click audibly into
place).
7. Plug the AC plug into the coupling (3) on the inverter (this clicks audibly into place).
8. Switch on the AC line circuit breaker. This switches on the inverter. The display shows the start
page for initial commissioning. Initial commissioning starts. A number of basic settings are
queried in a pre-defined sequence.
Detailed information on installation of the AC cables and the line circuit breaker is provided in
the downloadable version of the Operating Instructions.
9. Set the display language.
10. Set the date/time.
11. Set the country of use. Attention, the country can only be set once!
For detailed information on the country settings, see:
www.kostal-solar-electric.com/Download/PIKO_MP
Additional configuration may need to be entered, depending on the selected country.
12. Select Finish and press SET.
13. If the settings are incomplete then a dialogue stating Settings are incomplete is displayed.
Press SET and complete the missing basic settings.
14. When all settings have been made, a dialogue stating Are all settings correct? is displayed. To
correct any settings: press ESC. To finish initial commissioning: press SET for a longer period
of time (> 1 s). If SET was pressed for a longer time then the inverter starts anew and
synchronises itself with the grid.
15. Switch on the DC circuit breaker (6) on the underside of the inverter.
The inverter is ready for operation.
If you have questions or require additional information on installation, see the operating manual
under:
www.kostal-solar-electric.com/Download/PIKO_MP
06/2016 | DOC01666746 | KOSTAL Short Manual PIKO 1.5 - 4.2 MP