FUNCTIONING CONCEPT
Below, the 11 stages of system functioning are listed.
FIRST START-UP
ATTENTION: first start-up should be carried out by an authorised EDILKAMIN Technical Support
Centre (TSC) which will check:
• all the standards already mentioned and the standards in force in the installation location were
applied;
• correct installation of the boiler and the chimney flue;
• that there is no danger for the boiler and the installation environment.
IMPORTANT:
The manufacturer cannot be held liable for poor functioning of the boiler or any damage caused by
it to people or property if:
• first start-up was not carried out in compliance with the above;
• boiler installation was not carried out perfectly in compliance with standards;
• installation of the system was carried out without complying with the standards in force.
The manufacturer declines any disputes or complaints if the standards for good functioning of the
boiler are not complied with.
INSTRUCTIONS FOR USE
1
OFF
2
CHECK UP
3
SWITCH ON
4
STABILISATION
5
SWITCH ON RECOVERY
6
NORMAL
7
MODULATION
8
STAND BY
9
SAFETY
10
SWITCH OFF
11
BLOCK
- 77
-