Aprimatic RAIDER Instrucciones Para La Instalación página 27

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

4.1
SECURING THE REAR MOUNTING
After assembly, the mounting plate can be welded onto the pillar or secured to the masonry wall with Ø15mm steel or
cast-iron expansion bolts and M8 bolts (example in Fig.12).
CAUTION: If the masonry is not strong enough or if the wall made from perforated bricks, you should use
chemical plugs with M8 bolts (see the chemical bolt instructions).
Fig.12
Note: The plate has adjuster slots to
help you position the plate precisely
before tightening the bolts.
4.2
INSTALLATION OF THE OPERATOR ON THE REAR MOUNTING
Grease the vertical pin (Fig.13 réf.A) and then secure the operator to the mounting with the vertical pin. Secure the pin
with two circlips (Fig.13 réf.B).
!
Warning
During assembly and disassembly, handle the operator with care. Take precautions to prevent accidents to
those handling the operator or others in the surrounding area.
Fig.13
B
A
B
Two M8 screws + two Ø15 mm bolts (NOT supplied)
Fig.14
- 27 -
Installation

Publicidad

Tabla de contenido
loading

Tabla de contenido