MARKING
This product marked
- Low voltage no. 73/23 EEC, modified 93/68 EEC,
- Electromagnetic Compatibility no. 89/336 EEC, modified 92/31 and 93/68 EEC.
CONTENTS
1 - General ........................................................................ 2
2 - Presentation ................................................................ 2
3 - Installation of the unit .................................................. 3
4 - Connections / Electrical wiring diagrams .................... 4
5 - Accessories ................................................................. 8
6 - Starting ........................................................................ 8
7 - Maintenance ................................................................ 8
1 - GENERAL
1.1 - FOREWORD
• The equipment must be installed, started-up and maintained
by authorised and qualified personnel, in accordance with
local rules and professional standards.
1.2 - GENERAL SUPPLY CONDITIONS
• Generally speaking, the material is transported at the
consignee's risk.
• The consignee must immediately provide the carrier with
written reserves if he finds any damage caused during
transport.
1.3 - VOLTAGE
• Before any operation, check that the voltage and the
frequency indicated on the device corresponds with that of the
mains.
2 - PRESENTATION
2.1 - DESCRIPTION
1 - Air inlet (suction).
2 - Air outlet (blowing).
3 - Vertical deflection louvre.
4 - Horizontal deflection louvre.
5 - Air filters.
6 - Lamps and receiver.
7 - Remote control unit.
conforms to the essential requirements of the European Directives:
1
5
1.4 - PRECAUTIONS
1.4.1 - HYDRAULIC CIRCUIT
- Minimum water inlet temperature : 4°C.
- Maximum water inlet temperature : 60°C.
- Maximum operating pressure
1.4.2 - AMBIENT AIR
- Minimum air recirculation temperature : 5°C.
- Maximum air recirculation temperature : 32°C.
Important: During installation shut-down, in case of ambient
temperature near 0°C, there is a risk that the hoses may freeze.
Envisage draining the hydraulic circuit.
1.5 - USE OF EQUIPMENT
• This equipment is intented for the air-conditioning of premises
and to provide comfort for the personnel.
1.6 - MODELS
• "2-pipe" for all sizes.
6
4
3
2
7
: 16 bar.
Materiali :
• Carrozzeria plastica.
• Tubazioni in rame.
• Scambiatore rame/alluminio.
F
GB
I
E
D
2