installation guide
STEP 1
Place the bed base box in a desired location with the bottom of
the box facing up .
Remove the binding straps and packing materials, making sure
not to puncture the box with any sharp objects .
STEP 2
Remove the bed base from the box keeping the bottom of the base
facing upwards . TO SETUP A DIVIDED KING SEE INSTALL GUIDE.
STEP 3
To install headboard brackets: See detailed installation
instructions on page 16-17
To install the legs, thread the washer over the bolt of the leg with
the recessed side facing the leg, and tighten by hand . Do not
over tighten.
For customer support, visit www.ergomotion.com or call: 1-888-550-3746
10
Always use two people when setting up the base.
Stacking legs unscrew into two pieces for other leg height options .
STEP 4
To sync two bases with the SmartSync™ cord - see page 21
Uncoil the Power Down Box from the frame
and install (2) 9 Volt batteries- not included .
Place box on the ground . Ensure that it is
easily accessible when the base is turned to
its upright position .
STEP 5
Uncoil input cord (connected to control box's
power port) and plug into Power Supply .