Parameter Setting; Jumper Setting; Compressed Air Connection - PLYMOVENT MDB-2 COMPACT Manual De Instalación Y De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 60
ATTENTION
To meet the IFA W3 certification requirements, you
must install an additional 24 VDC strobe light to
emphasize the alarm status of the FilterControl
panel. It must perform 65 +/- 10 flashes per minute
at a light intensity of 700-1000 cd, in accordance
with standard EN 842:1996+A1:2008.
Fig. 4.3
• Install the FilterControl panel at an appropriate position.
• Open the FilterControl panel with the supplied double-bit
key.
• Put the supplied cable glands in the bottom of the
FilterControl panel;
A: M20 steel
B: M16 black
C: M20 black
D: M16 black pp
X3
1
2
3
4
5
Refer to section 4.6 for the specific connections and
cable specifications
• Connect the FilterControl panel to the filter unit in
accordance with the separately supplied electrical diagram.
0000104050/0
• Connect the FilterControl panel to the mains in accordance
with the separately supplied electrical diagram.
A
B
X3
1
2
3
4
5
6
7
8
0000104050/0
A
B
Fig. 4.3
Electric connection of the FilterControl panel

Parameter setting

In case of PRECO-N (precoat) on CART-D or CART-C filter
cartridges, you must make a jumper setting on the terminal
block to postpone the initial activation of the cleaning system
Fig. 4.4
• If applicable, put a jumper on the terminal block (A).
Use of PRECO-N
(refer to section 4.8)
X3
1
2
3
4
5
6
7
8
A
X3
1
2
3
4
5
A
Fig. 4.4
Terminal block inside FilterControl panel
A
9. To maintain the protective layer of PRECO-N on the filter cartridges, the filter
cleaning system will not be activated during the first 30 running hours of the
fan and within 30 hours after filter replacement.
0000104046/150915/0 MultiDust Bank COMPACT
6
7
8
9 10 11 12 13 14 15 16 17 18 19
C
D
9 10 11 12 13 14 15 16 17 18 19
C
D

Jumper setting

yes
9+10
no
none
9 10 11 12 13 14 15 16 17 18 19
6
7
8
9 10 11 12 13 14 15 16 17 18 19
4.6.2
Fan
To start the fan, the start/stop device receives a 24 VDC signal
from the PLC.
A start/stop device is not included in the scope of
supply. To reduce peak loads on the mains, we
recommend the installation of a star-delta switch, a
frequency inverter or an equivalent to start the fan.
The fan starter must be able to receive a 0-24 VDC
signal from the PLC.
ATTENTION
In case of connection voltage 400V/3ph/50Hz:
The use of a frequency inverter makes the 60 Hz fan
suitable to run on a 50 Hz power grid.
Setting of frequency inverter:
- input voltage: 400V
- output voltage: 230V
- frequency: max. 60Hz
Fig. 4.5
• Disassemble the front panel (A) of the fan housing.
• Connect the fan to the mains in accordance with the
separately supplied electrical diagram, the wiring diagram
on the motor connection block and the identification plate.
• Connect the PTC cable in accordance with the separately
supplied electrical diagram.
• Push the
START/STOP FAN
fan.
• Make sure that the direction of rotation of the motor is
correct (clockwise). An arrow (B) on the motor shows the
correct direction of rotation.
• Push the
START/STOP FAN
• If necessary: change the connection of the phases.
• Install the front panel.
.
9
Fig. 4.5
Electric connection of the fan
4.7

compressed air connection

ATTENTION
The compressed air must be dry and oil-free
according to ISO 8573-3 class 6.
To connect the compressed air, proceed as follows.
button (ref. Fig. 5.1A) to start the
button again to stop the fan.
B
A
EN - 9

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Mdb-4 compactMdb-6 compact

Tabla de contenido