System Setup - Briggs & Stratton 100 Manual De Instalación Y Operador

Ocultar thumbs Ver también para 100:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

System Setup

1.
TCRM board. This is only applicable to
Briggs & Stratton ® generator controller
software version E1 or higher,
hardware E4 or higher.
• Go to the generator control panel.
• Access advanced menu/screen
settings. For explanation on how to do
this, read the Control Panel section of
the generator manual.
• In the advanced menu, scroll to
transfer switch settings as shown.
• Set to TRCM and press OK.
2.
You must perform the following before
operating the system:
• If generator is installed in an area
regularly subjected to temperatures
below 40°F(4°C), select a 50 second
warm up time at the advanced menu
settings. Factory default is set to a 20
second warm up.
• Insert the 15A ATO fuse into
the fuse holder of the generator
controller. Measure voltage across
terminal labeled GND and +12V DC
at generator electrical box. Voltage
measured should be around +12V DC.
• If no voltage is measure across
terminal labeled GND and 12V DC
check to make sure hardware revision
of control panel is E4 or higher.
10
"ADVANCED SETTINGS"
WILL SCROLL
KW
or
HZ
or
PHASE
or
VOLTS
or
*
E-Governor
Check
or
SOFTWARE VERSION
DISPLAYED
or
Transfer Switch
or
Utility Dropout
or
Utility Pickup
or
Warm-up Time
or
KW
OK
FLASHING
or
50/60 Hz
OK
FLASHING
or
SINGLE
or
OK
THREE
FLASHING
or
VOLTS
OK
FLASHING
or
Stepper Motor
will sweep through throttle
OK
range for dealer
visual verification
or
*ONLY APPLICABLE ON SOME MODELS
ACCM
ACCM
or
TRCM
TRCM
or
70%
or
OK
80%
or
80%
or
OK
90%
or
20 Seconds
or
OK
50 Seconds
or
BRIGGSandSTRATTON.COM
OK
OK

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

150200

Tabla de contenido