EQUIPMENT INSTALLATION
• Put the machine on the floor (maximum incline of 10°).
• Provide an adequate area to ventilate the machine and access the controls.
• The machine must be placed in a sheltered area away from rain or direct sunlight.
• This equipment must be used and stored in a place protected from dust, acid, gas or any other corrosive substance.
• The machine protection level is IP23, which means :
- a protection against access to dangerous parts from solid bodies of a Ø≥12.5mm and,
- a protection against the rain inclined at 60% towards the vertical.
The equipment can be used outside in accordance with the IP23 protection certification.
• The power cables, extensions and welding cables must be fully uncoiled to prevent overheating.
The manufacturer does not accept any liability in relation to damages caused to objects or harm caused to persons as the result
of incorrect and/or dangerous use of the machine.
MAINTENANCE / RECOMMENDATIONS
• Maintenance should only be carried out by a qualified person. A yearly maintenance is recommended.
• Ensure the machine is unplugged from the mains, and then wait 2 minutes before carrying out maintenance work. Inside the
machine, voltage and current levels are high and dangerous.
• Regularly remove the case and remove any excess dust. Take the opportunity to have the electrical connections checked by a qualified person, with
an insulated tool.
• Regularly check the condition of the power supply cable. If the power cable is damaged, it must be replaced by the manufacturer, its after sales
service or an equally qualified person to prevent danger.
• Ensure the vents of the device are not blocked to allow adequate air circulation.
• Do not use this equipment to thaw frozen pipes, to charge batteries, or to start engines.
INSTALLATION – PRODUCT OPERATION
Only qualified personnel authorised by the manufacturer should perform the installation of the welding equipment. During the
installation, the operator must ensure that the machine is disconnected from the mains. It is recommended to use the welding
cables supplied with the unit in order to obtain the optimum product settings.
EQUIPMENT DESCRIPTION (FIG-1)
1-
- polarity plug
2-
+ polarity plug
3-
Interface (MMI)
4-
ON / OFF switch
NEOPULSE is a three-phase power source for semi-automatic «synergic» welding (MIG or MAG / GMAW), coated electrode welding (MMA / SMAW)
and refractory electrode welding (TIG / GTAW).
INTERFACE (MMI) (FIG-2)
Thermal protection indicator
1-
Switched on when the machine overheats. The current use of the machine is higher than the duty cycle. In the event of a fault, the
thermal protection indicator lights up. Check the wire feeder instructions to rectify the error.
Indicator, Welding current source is ON.
2-
Switched on when the machine is welding.
Indicator, Welding current source is mains powered.
3-
Switched on when the power supply cable is connected and the ON/OFF switch is set to I.
NEOPULSE 400 G / 500 G
5-
Power supply cable
6-
Separated wire feeder command connector
7-
Dinse power connector
8-
External grill