Preparing for installation:
• Preparation of the ceiling plate
• Drilling the ceiling to fix the ceiling plate
• Fixing the ceiling plate
• Connecting hood-plate cables
• Fitting the hood body
• Levelling the hood
• Electrical connections
• Disposal of packaging
1
1.1
1.3
12g
• Unfasten the 3 screws of 1.3 that join the parts of the Plate (of different shapes and/or sizes) using the
wrench provided.
• Insert the lamp holders (12f) in the position indicated in the figure 1.2, and secure them using the nuts.
• Take the Pawl (14) and secure it to the ceiling plate on the bracket in the position indicated in figure 1.3
using the Screw (12g) provided.
• Tighten the Screw fixing the bulb holders to the bracket, in such a way as to hold the latter between the
2 washers.
12
Sequence of operations - Installation
Preparation of the ceiling plate
14
12f
1.2