Broan Elite E64000 Serie Manual De Instalación página 9

Ocultar thumbs Ver también para E64000 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6. CHOOSE THE OPENING(S) (INTERNAL BLOWER HOODS ONLY)
Remove the knockout for the chosen opening(s) (horizontal at the back of the hood or vertical on top).
See illustrations below.
VERTICAL
DISCHARGE
installation
O
HR0021
HORIZONTAL DISCHARGE
NOTE:
For ducted
only.
O
O
O
_b
Punch out the appropriate electrical knockout hole on top (A) or back (B) of the
hood. Install the wire clamp (included in parts bag).
NOTE: For a non-ducted installation, punch out the back electrical knock-out (B).
B
7. HORIZONTAL DISCHARGE INSTALLATION (INTERNAL BLOWER(S) O NLY)
All internal blower hoods are factory shipped with the blowers mounted for a vertical discharge configuration.
For a horizontal
discharge configuration, disassemble the blower(s) from the inner top of the hood and mount it (them) to the back panel of the
hood. The procedure below applies for one or two motors.
Unplug the blower.
Using
a 5/16" socket,
remove all
blower mounting
screws from the
inner top of the hood. Keep the
screws for further use.
-9-

Publicidad

Tabla de contenido
loading

Tabla de contenido