Ventilation And Air-Conditioning - KBL megaSun 7900 alpha Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

REPLACING THE SPRING-LOADED WIRE ROPES
Figure 40
19
Involve a second person to secure the canopy
against falling down.
Remember the position of the nut at the
spring tensioner. Then slacken the spring
using a pipe wrench SW19.
Undo the upper rope holder SW13.
Replace the wire rope. Fix and tension it.
Grease the rope in the area of the return pulley
with copper crease or adhesive lubricant
HHS-2000.
13

Ventilation and air-conditioning

In order to preserve the performance of the air-con-
ditioning unit, clean the heat exchangers after
500 - 600 hours of operation.
Figure 41
Air-conditioning unit
Heat exchanger
Condensate pump
Condensate tray
Page
Open the bench part.
40
Clean the heat exchanger.
Vacuum it carefully, paying attention not to
damage the fins.
M a n u a l d e i n s t r u c c i o n e s | megaSun 7900
α
49
lpha

Publicidad

Tabla de contenido
loading

Tabla de contenido