Fig. 13a - Detailed example of a remote link
To access the 4-core cable for remote connection it is
necessary to remove the upper cover of the boiler (see
paragraph 9.1 Fig. 18), and take the cable outside
through the dedicated opening, that is already present
on the back cover, as indicated in Fig. 14.
Fig. 14 – Cables for remote connection
Page 22
6.7
Digital input 1
Digital input 2
Fig. 15 – Wiring diagram
Wiring diagram
Installation and user manual
port 1
(upon
request)
supply