Festo HGPP-A Serie Instrucciones De Utilizacion página 26

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 31
HGPP-...-A
Setting the closing time
Tighten the restrictor screws of the upstream GRLA-... /GRLZ-...
S
– at first completely
– then open again approximately one turn.
Start a test run in the sequence specificed below:
S
Test run
Without work load
With work load
Fig. 20
1. Listen to the knock of the piston.
Piston knock
Soft
Continue test run with points
2 and 3
Fig. 21
2. Loosen the restrictor screws of the upstream GRLA-... / GRLZ-... by one turn.
3. Repeat points 1 and 2 until the desired gripping speed is reached.
Conclude the test run.
S
Exhaust the gripper.
S
26
Checks to be made
– Compressed air connections must be assigned cor-
rectly
– Gripping speed
– Sensor functions
– Work load must be held firmly
Metallic
Tighten the restrictor screw one turn.
The maximum gripping speed has been reached.
Conclude test run.
Festo HGPP-...-A 0110a English

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Hgpp-10-aHgpp-12-aHgpp-16-aHgpp-20-aHgpp-25-aHgpp-32-a

Tabla de contenido