ENGLISH
GENERAL DIAGRAM FOR INSTALLATION OF GATE-FILTER-
STABILIZER-ANTI-VIBRATION JOINT-OPENABLE PITTING
ELECTRICAL CONNECTIONS
The three-phase or single-phase power supply line of the minimum suitable size for the power absorbed by the
burner must be provided with fuse switch. In addition, according to the Standards, a switch on the burner supply
line is required, arranged outside the boiler room in an easily reachable position.
All electrical lines must be protected with a flexible sheath, be firmly fixed and pass far from high-temperature
elements. See the diagrams for the electrical connections (line and thermostats).
BURNER CONNECTION TO THE GAS PIPING
After attaching the burner to the boiler, remembering that the burner's blast-pipe must penetrate the combustion
chamber, connect it to the gas piping. It is advisable to install, as close as possible to the burner, a flange
couple connection to allow the boiler's door to be opened without difficulty and to permit burner disassembly .
Before closing this connector the air in the piping should be carefully bled out with doors and windows open.
Before testing the burner, you must check the gas piping is completely free from any leaks.
23