Thru-The-Wall Installation - Friedrich SQ06 Manual De Instalación Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Thru-the-wall Installation

IMPORTANT: Some municipalities or jurisdictions require that window
units are installed by licensed contractors. Check your local codes and
ordinances prior to attempting installation.
WARNING
Falling Object Hazard
Not following Installation Instructions
for mounting your air conditioner can
result in property damage, injury, or
death.
STEP 1.
After removing the unit from shipping carton, slide chassis out
of sleeve. (See Figure 29)
STEP 2.
Remove shell channel from top of the sleeve. (See Figure 30)
Figure 29
STEP 1
Figure 31
CONCRETE BLOCK CONSTRUCTION
22
2" x 8" FRAME
20"
14-1/4"
STEP 3.
LAYOUT - Cut and frame in an opening in the desired wall area
using the illustration as a guide. (See Figure 31)
STEP 4.
Place the sleeve in the framed opening.
Measure and shim void spaces between the side of sleeve and
NOTE:
wood framing before securing to wall.
STEP 5.
Position the front edge to extend into the room 3/4" minimum
at top of sleeve and 1" minimum at bottom (See Figure 32).
STEP 6.
Secure each side of the sleeve with supplied 1 ¼" screw
(F in parts list) or nails through the holes in the sides.
Alternate fasteners which may be used for securing the unit
NOTE:
sleeve to a wall, including masonry walls, are not furnished
(available at local hardware stores).
MOLLY OR TOGGLE BOLT
Figure 30
STEP 2
FINISHED OPENING SIZE
FRAME CONSTRUCTION
EXPANSION ANCHOR BOLT
20"
14-1/4"
FRR091

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Sq08Eq08

Tabla de contenido