Broan Elite Chimney Island Manual De Instrucciones página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

F R O N T
15. Remove wiring cover and connect house wiring to hood
wiring – black to black, white to white, green to green. Re-
attach wiring cover.
6" ROUND STEEL DUCT
(Ducted Hood)
6" ROUND FLEXIBLE
METAL DUCT
(Non-Ducted Hood)
DUCT LENGTH
FOR DUCTED HOOD
16.
Measure, cut, and install steel duct between hood's duct
connector and duct rough-in in ceiling. Use duct tape to
make all joints secure and air tight.
FOR NON-DUCTED HOOD
Measure, cut, and install flexible metal duct between hood's
duct connector and non-duct plenum. Use duct tape to
make all joints secure and air tight.
CAUTION
Do not use plastic duct.
17.
18.
19. Reinstall grease filter by aligning rear filter tab with slots
DECORATIVE
FLUE
20. Carefully place the (2) upper flue sections on the hood
21. Gently push the lower parts of the flues together and
NON-DUCT HOOD ONLY
Attach filter tray to bottom of hood using (4) .188" x .375"
mounting screws.
NON-DUCT HOOD ONLY
Snap in 2-non-duct filters into filter trays by engaging filter
tab on side, rotating upward, and pressing firmly on (2) filter
clips.
in the hood. pull down the metal latch tab, push filter into
position and release. Make sure filter is securely engaged
after installation.
frame.
Note that the louvers should be on top for a non-ducted
application, and on the bottom for most ducted applications.
Make sure that the clearance holes (larger) are in front of the
attachment holes (smaller) where the two flue halves meet.
While gently pushing the two flue sections together and
sliding them to the top of the frame, attach the flue sections
together through the top attachment slots and into the upper
frame mounting holes using (2) 4mm x 12mm screws.
complete attachment using (6) 3mm x 5mm screws.
MODEL EI5936SS
Page 7
4mm x 12mm
SCREWS
3mm x 5mm
SCREWS

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ei5936ss

Tabla de contenido