Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

C
HEMICAL
Fit the module to a suitable surface, in an accessible area, using the self-adhesive velcro provided.
Before fitting, please ensure that the power to the unit has been isolated.
Remove the green connector from the end of the Chemical Enable cable. Open the lid of the first Box.
Pass the cable through the gland situated on the bottom of the unit and run it to the vicinity of the Chemical Enable
connection socket on the Powerboard (or I/O Board), see page 9 or 11.
Refit the green connector with the coloured wires in the order shown above. Plug the connector into the correct
socket and tighten the gland to grip the cable.
The Chemical Enable Module will automatically be accepted by the unit and will require no additional
programming.
The relevant Pumps will now be disabled during each wash cycle unless the corresponding button has been
pressed to activate it.
E
-
NABLE
I
Red
Black
Yellow
White
Green
Blue
NSTALLATION
21
E
NGLISH
B
L
S
RIGHTSTAR
AUNDRY
YSTEMS

Publicidad

Tabla de contenido
loading

Tabla de contenido