4. Mechanical Installation
The SL600AC will handle gate weighting up to 600kg and up to 8m/12m if the proper installation procedures have been followed.
The SL600AC gate operator operates by forcing a drive rack by a drive gear. The entire configuration is shown in the diagram
below. The gate operator must be installed on the inside of the gate.
Sliding gate
Gate operator
Fig.1
Gate preparation
Be sure the gate is properly installed and slides smoothly before installing the SL600AC sliding gate operator. The gate must be
plumb, level, and move freely.
Conduit
In order to protect the cable, use PVC conduit for low voltage power cable and control wires. Conduit must be preset into the
concrete when it is poured. Wires within the conduit shall be located or protected so that no damage can result from contact with
any rough or sharp part.
Concrete pad
The base unit of the gate operator requires a concrete pad in order to maintain proper stability. The concrete pad should be
approximately 450mm x 300mm x 200mm deep in order to providing for adequate weight and structure to insure proper stable
installation.
Anchors (see Fig.2)
You can use anchor bolts, anchors, washers and nuts. These anchors must be set into the concrete when it is poured or you can
use wedge anchors to fasten the operator.
Operator base (see Fig.3)
After the concrete has hardened, mount the gate operator base to the concrete pad. Verify that the base is properly leveled.
Using bolts and washers mount the gate operator to the base and insert the cover. Check the operator and make sure it is lined
up with the gate.
Switch
Wall

Input power

Rack
Fig.3
https://appceso.com
Gate operator
Gear
Groundsill
Input power
Fig.2
Nut
Spring washer
Plain washer
Nut
34

Publicidad

loading

Este manual también es adecuado para:

Sc600acSc600acu