Performance Checklist - AGA marvel MP36BF2 Guia De Instalacion

Refrigerador/ congelador integrado
Ocultar thumbs Ver también para MP36BF2:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Performance Checklist

□ Verify cabinet size.
□ Verify electrical supply and water supply
(if applicable).
□ Install anti-tip device(s) and verify unit is
secure.
□ Position unit in cutout, level at desired
height and secure unit.
□ Plug-in unit and verify operation.
□ Connect water supply (if applicable).
• Verify icemaker fill tube is properly
inserted.
• Verify icemaker bail arm is down.
• Verify dispenser operation
(if applicable).
□ Align/square door(s).
□ Verify drain pan is properly installed and
there are no leaks on water connection.
□ Install kickplate.
□ Remove internal packaging and labels and
wipe unit down.
Installer's information:
Installer's name:
_____________________________
Installer's company:
_________________________
Date:
________________________________________
29

Publicidad

Tabla de contenido
loading

Tabla de contenido