Performance Checklist - AGA marvel MP42SS2 Instrucciones De Instalación

Ocultar thumbs Ver también para MP42SS2:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Performance Checklist

—Verify cabinet size.
— Verify electrical supply and water supply (if applicable).
— Install anti-tip device(s) and verify unit is secure.
— Position unit in cutout, level at desired height and secure unit.
—Plug-in unit and verify operation.
—Connect water supply (if applicable).
• Verify icemaker fi ll tube is properly inserted.
• Verify icemaker bail arm is down.
—Align/square door(s).
— Verify drain pan is properly installed and there are no leaks on water connection.
—Install kickplate.
— Remove internal packaging and labels and wipe unit down.
Installer's information:
Installer's name: _________________________________________________________________
Installer's company: ______________________________________________________________
Date: __________________________________________________________________________
31

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Mp48ss2

Tabla de contenido