Performance Checklist - AGA marvel MP30RA2 Instrucciones De Instalación

Ocultar thumbs Ver también para MP30RA2:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Performance Checklist

Verify cabinet size.
Verify electrical supply and water supply (if applicable).
Install anti-tip device(s) and verify unit is secure.
Position unit in cutout, level at desired height, and secure unit.
Plug-in unit and verify operation.
Connect water supply (if applicable).
• Verify icemaker fill tube is properly inserted.
• Verify icemaker bailarm is down.
Align/square door(s).
Verify drain pan is properly installed and there are no leaks in water connection.
Install kickplate.
Remove internal packaging and labels and wipe unit down.
Installer's information:
Installer's name:
_____________________________
Installer's company:
_________________________
Date: ________________________________________
41

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Mp36ra2Mp30fa2Mp36fa2

Tabla de contenido