Heating Priority Wiring - Hayward ENERGYLINE PRO Manual De Instalación E Instrucciones

Ocultar thumbs Ver también para ENERGYLINE PRO:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 70
6. APPENDIX (continued)
6.2 Heating priority wiring for monophasic pump
OUT2
Dry contact 7 A max
Power supply
230V
/ 50Hz
Monophasic pump
Terminals 1 and 2 deliver a potential-free dry contact,
230 V
/ 50 Hz, no polarity.
Wire terminals 1 and 2 as indicated in the diagram
above, to activate the operation of the filtration pump
in 2-minute cycles each hour if the temperature of the
pool is lower than the set point.
Never connect the power supply of the filtration
pump directly to terminals 1 and 2.
22

Publicidad

Tabla de contenido
loading

Tabla de contenido