Cabinet Blower Preparation - Broan ELITE E662 Guide D’installation

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6. INSTALL THE HOOD (CONT'D)
6.3 Attach the second wire clamp, insert the power cable in the hood and tighten the wire clamp to secure the cable.
Place the hood under the cabinet and slide it in position. Run power cable from hood up through slot cut in cabinet.
Tighten the (4) screws completely, the add the last scerw (scerw no 5) in the center keyhole.

7. CABINET BLOWER PREPARATION

7.1 VERTICAL DISCHARGE ONLY
7.1.1 Seal the metal shutoff plate on the back of the cabinet
blower using duct tape.
7.2 HORIZONTAL DISCHARGE ONLY
7.2.1 The cabinet blower included with the E662 model is factory
set to exhaus vertically. If the horizontal discharge is
chosen, remove the metal shutoff plate from back of the
hood, by removing the 3 screws. Set aside screws. Discard
both left and right plastic diverters assembled to the metal
shut off plate.
7.2.2 Press the metal shutoff plate on a surface to completely flatten
bent flange and install on the top of the blower, using the 3 screws
previously set aside plus another no. 8 x 1/2" screw (from parts
bag).
7.2.3 Fold down the foldable flange of the adapter/damper. This flange must be at
90° from the remaining flanges. See picture beside.
7.2.4 Using three (3) no. 8 x 1/2" screws provided with hood,
secure the adapter to the back of the cabinet blower. Remove
tape from damper flap. Seal the adapter and the metal shuoff
plate to the cabinet blower using duct tape.
HD0130
HD0131
HD0119
HD0132
- 5 -
HD0112

Publicidad

Tabla de contenido
loading

Tabla de contenido