Olsberg Turia Lina Compact 23/625 Manual De Instrucciones página 15

Ocultar thumbs Ver también para Turia Lina Compact 23/625:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

and fold it out of the wall bracket.
– Break the cover for the rear stove pipe connection
out of the wall bracket.
– Fold back the thermal insulation and fasten with
the brackets.
– Through the hole of the broken-out cover, cut out
the hole for the rear stove pipe connection in the
thermal insulation.
● The combustion air connection for room air inde-
pendent operation can be executed either to the rear
or below. The device is delivered pre-assembled for
the rear connection.
Proceed as follows for a bottom connection:
– Pull out the drawer under the combustion chamber
door and lift it out.
device.
– Swap the rear connection duct and the lower seal-
ing cover.
● For room air dependent operation:
– Pull out the drawer under the combustion chamber
door and lift it out.
– Unscrew the lower sealing cover in the device.
● Determine the installation location for the stove.
present or be placed in the radiation area of the
stove to a distance of 80 cm, measured from the
view pane of the combustion chamber door.
lateral 17 cm
● Install the pipe lining (customer-provided) in the
chimney. For the top stove pipe connection, the con-
nection height can be individually determined, how-
ever it should not exceed 1.5 m from the connec-
tion duct. For the connection height for the rear stove
pipe connection see chapter "Technical data". There
cle around the stove pipe, for the passage through
● Align the wall bracket as a template at the desired
position on the wall with a spirit level, hold it in place
and mark the positions of the 6 fastening holes (see
Fig. 5).
● Attention: When using the recommended fastening
system in vertical coring brick, drill the 6 fastening
– Break the lower cover out of the arched floor of the
holes through turning, without impact.
● For connection of room air independent operation
with air supply from the rear, the air inlet duct on the
wall bracket must be sealed with silicone on the wall.
● Pre-mount the wall bracket with the suitable fasten-
ing system and the provided D=34 washers for M10
screws, align it using a spirit level and screw it tight
against the wall.
● Lift the stove onto the skids of the wall bracket.
Objects made of flammable materials must not be
Minimum distance to flammable or bearing walls:
should be no flammable material within a 20 cm cir-
structural components made of flammable materials.
400
Fig. 5 Wall bracket
1 Fastening holes for wall bracket
2 Air inlet duct
3 Fastening bolts M12
4 Adjusting screws for alignment
● Slide and align the stove in front of the wall brack-
pipe lining. Connect the stove pipe at both connec-
tion points with stove putty so that the stove pipe is
permanently sealed.
The stove pipe connections must be sealed. The
stove pipe must not project into the chimney.
● If needed the device can be aligned in the skids
(Fig. 5) with the adjusting screws.
● Bolt the stove to the wall bracket with the 4 previ-
ously dismounted washers and M12 fastening nuts.
● If provided, mount the OEC. To do this, pull out the
drawer under the combustion chamber door and lift
it out.
Route the cables, OEC power connection and OEC
2
the device, behind the set up sheet metal clips so
that the cables are not caught by the drawer.
● Mount the side cladding.
● Fit the cover hood back on and only screw it on the
front.
Bear in mind that on partition walls in accordance
of 85°C can be reached, and with light wallpaper
or similar combustible construction materials, this
can result in colour changes.
et in such a manner that the stove pipe fits into the
temperature sensor, lower right in the floor space of
with test specification EN 13240, the temperature
1
3
1
3
1
4
15

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Turia lina compact 23/626

Tabla de contenido