Enerpac PUD1100B Manual Del Usuario página 3

Bombas electricas portatiles de 1/2 hp
Ocultar thumbs Ver también para PUD1100B:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 47
41
9
1C
B
1D
38
Item
Part Number
9
DA3709900
DA3728900SR
12
CR759291
38
E300006
E300007
41
CR881900SR
48
DA12343900SR
67
A1009245
101
DA12490840SR
122
C846037
Note: Item 101 (DA12490840SR), includes Item 121 (DA5999900SR) shown on page 6.
Items included in and available only as part of Repair Kit PUD1100BK.
48
12
C
C
Figure 2 - Top View
Repair Parts List for Figure 2
Qty.
Description
1
115V Power Cord
1
220V Power Cord
3
Cord Bushing
1
115V/24V Transformer
1
220V/24V Transformer
1
Remote Pendant
Assembly
1
Wire Assembly, to valve
2
Plug
1
Pump Manifold
1
Gasket
131
130
129
126
SECTION "C-C"
with valve removed
B
140
149
Torque Item 149 to 8-10 ft-lbs
(10,8-13,5 Nm).
67
Item
Part Number
123
DA5771290
125
DC990900
126
A109164
128
DA252028
129
S1167
130
CW306055
131
CW307055
140
R51245-2
149
B1020028
3
129
128
125
123
Torque Item 123
to 15-16 ft-lbs
122
(20,3-27,6 Nm)
lubricated.
101
Qty.
Description
1
Seat
1
Ball Guide
1
Spring
1
Adjusting Screw
2
Gasket
1
Lock Nut
1
Cap Nut
1
Plug
4
Cap Screw

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

1101b1100e1101e

Tabla de contenido