Electrical diagram of the system
Grid
Connection diagram of the PV generation in a three-phase installation
Grid
Connection diagram of the PV generation in a three-phase installation with single-phase inverters
Install the PV generation and the installation loads after the wattmeter.
3.2. Load control
The INGECON EMS Manager is equipped with two potential-free contacts that allow:
•
Load control to be carried out.
AAX2019IQM01_A - Installation and usage manual
W
Wattmeter
W
Wattmeter
Ingeteam
Loads
EMS Manager
Loads
EMS Manager