Island Operation - Ingeteam INGECON EMS Manager Manual De Instalacion Y Uso

Ocultar thumbs Ver también para INGECON EMS Manager:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 55
Ingeteam
A1
Grid
External contactor for island operation. See Section "3.3.1. Island operation".
(1)

3.3.1. Island operation

To enable the system to operate in an isolated manner the following is necessary:
An external contactor after the wattmeter connection, connected to the INGECON EMS Manager.
Power the INGECON EMS Manager using the AC Out output of one of the inverters/chargers.
If you do not want to equip the system with island operation, the additional external switch will not be necessary
and the INGECON EMS Manager can be powered from the installation's consumption grid.
40
External contactor
B1
W
Wattmeter
A1
B1
Potential-free contacts
Connection diagram of the storage system in three-phase installation
(1)
EMS Manager
A1
B1
AAX2019IQM01_A - Installation and usage manual
Electrical diagram of the system
Loads

Publicidad

Tabla de contenido
loading

Tabla de contenido