Electrical diagram of the system
3.3. Storage
Storage systems, like PV generation units can be connected in single and three-phase installations.
If the self-consumption installation has PV generation, refer to the corresponding diagrams in this
manual ("3.1. PV generation") and carry out a combination between these and the ones shown in
this section.
It is important to install the installation's loads after the wattmeter and the storage system (and the
PV generation, if present). In this way, the consumption will originate from the renewable generation
sources.
The power supply to the INGECON EMS Manager in installations with storage, with possible island
operation, will come from the inverter/charger.
In three-phase installations, inverter/chargers must be connected to the same battery bank.
A1
Grid
Wattmeter
Connection diagram of the storage system in a single-phase installation
External contactor for island operation. See Section "3.3.1. Island operation".
(1)
AAX2019IQM01_A - Installation and usage manual
External
contactor
(1)
B1
W
EMS Manager
A1
Loads
B1
A1
B1
Potential-free contacts
Ingeteam
DE
EN
ES
FR
IT
PT
39