INSTALLATION

• Support Installation

1. determine primary direction of product
flow. figure 4A indicates the preferred
flow as related to the drive.
2. Refer to "Match-Mark" numbers on
ends of conveyor sections. (figure 4A).
Position them in this sequence near the
area of installation.
3. Attach supports to both ends of drive
section and to one end of intermediate
or tail sections (figure 4A). Hand tighten
bolts only at this time.
4. Adjust elevation to required height.

• Ceiling Hanger Installation

If conveyors are to be used in an overhead application, ceiling hangers may
have been supplied in place of floor supports.
figure 4B shows how a ceiling hanger mounts to a conveyor section.
Ceiling hangers should be mounted at section joints. for safety information
concerning conveyors mounted overhead, refer to "Installation Safety
Precautions" on Page 3.
NOTE: When installing ceiling hanger rods in an existing building, all
methods of attachment must comply with local building codes.
CEILING HANGER ROD
(VARILLA COLGANTE
MOUNTING BOLTS
(TORNILLOS DE MONTAJE)
SIDE CHANNEL
(CANAL LATERAL)
SHAFT KEY
(SEGURO DEL EJE)
PIPE RETAINER
(ABRAZADERA)
LOCK BOLT
(TORNILLO CANDADO)

• Conveyor Set-Up

1. Mark a chalk line on floor to locate center of the conveyor. (floor Mounted
Conveyors).
2. Place the drive section in position.
3. Install remaining sections, placing end without support on extended support
of previous section (figure 4A). Check "Match-Mark" Numbers to see that
adjoining sections are in proper sequence.
4. fasten sections together with splice plates and pivot plates (figure 4d and
4E). Hand tighten bolts only at this time.
5. Check to see that conveyor is level across width and length of unit. Adjust
supports as necessary.
6. Insure that all bed sections are square. Refer to Page 4-5 for instructions
on "How to Square The Beds".
7. Tighten all splice plates and support mounting bolts and lag conveyor to
floor.
8. Check to see that drive shafts are properly aligned at section joints.
Misalignment of shafts will cause excessive wear to coupling chain and
sprockets. Adjust coupling sprockets as shown in figure 4d.
9. Install coupling chain.
10. Install shaft guards on 190-NSP and 190-NSPSS conveyors (figure 4C).
190-NSPC and 190-NSPS are shipped with guards attached.
11. Install electrical controls and wire motor. See Page 5.
FIGURE 4A
TAIL SECTION
(SECCION DE RETORNO)
"2"
ADJUST TO DESIRED
ELEVATION
(AJUSTE A LA ALTURA
DESEADA)
FIGURE 4B
AL TECHO)
RETAINER RING
BASE PLATE
(ANILLO RETENEDOR)
(PLACA BASE)
JAM NUT
(CONTRA TUERCA)
SUPPORT PIPE
(TUBO DE SOPORTE)
COUPLING CHAIN
JAM NUT
(CADENA DE UNION)
(CONTRA TUERCA)
INTERMEDIATE SECTION
(SECCION INTERMEDIA)
FLOW
"4"
FIGURE 4C
SHAFT
BEARING
(CHUmaCera)
FIGURE 4D
CHAIN PIN
(SEGURO DE CADENA)
COUPLING CHAIN
SPROCKET WITH SPRING
(CATARINA CON RESORTE)
FIGURE 4E
MOUNTING BOLT
(tOrnIllO de mOntaJe)
SIDE CHANNEL
(Canal lateral)
(plaCa de empalme)

• Racked Sections

It is important that each bed section be checked for a "racked" or
out-of-square
condition.
problems
will
result.
TO CORRECT AN OUT-Of-SQUARE SECTION
1. Locate points on corners of section and measure distance "A" & "B". If the
dimensions are not equal, the section will need to be squared. (figure 5B).
2. Use crossbracing supplied on underside of conveyor to square
each section. Adjust turnbuckle until dimensions "A" & "B" are equal.
3. After all bed sections have been checked and corrected for
"racked condition",tighten all splice plates and pivot plate bolts.
4. Make final check to see that all conveyor sections are level across width
and length. If entire conveyor is level, supports can be lagged to floor.
4
DRIVE SECTION
TAIL SECTION
(SECCION MOTRIZ)
(SECCION DE RETORNO)
A
CONVEYOR
1
2
ITEM
TO
HYTROL CONVEYOR CO. INC.
JONESBORO, AR
"MATCH-MARK" NUMBERS
(ETIQUETAS DE SECUENCIA DE ARMADO)
GUARD SNAPS
OVER BEARING
(gUarda de presIOn
del rOdamIentO)
SHAFT GUARD RETAINER
(TWO PER SECTION)
(retenedOr de gUarda de eJe)
(dOs pOr seCCIOn)
SHAFT GUARD
(gUarda de eJe)
SET SCREWS TORQUE
TO BE 141 IN-LBS.
SPROCKETS HAVE
INTEGRAL KEYS
SPROCKET
VIEW "A-A"
(VISTA "A-A")
5/16"
SHAFT JOINT DETAIL
SIDE CHANNEL
(Canal lateral)
SPLICE PLATE
STATIONARY SUPPORT
(sOpOrte estaCIOnarIO)
If
conveyor
is
not
figure
5A
indicates
"2"
A
CONVEYOR
2
1
ITEM
TO
HYTROL CONVEYOR CO. INC.
JONESBORO, AR
COMPRESSION SPRING
(RESORTE DE COMPRESION)
5/16"
PIVOT PLATE
(plaCa pIVOte)
square,
tracking
a
racked
section.